Pool staked out and lines painted for pool outline
Buttresses installed, rails leveled and ready to install walls
Walls installed and ready to float Perlite floor (Perlite floor done for additional cost)
Perlite floor installation
Liner hung and filling with water
Completed pool ready to swim