This was a mighty long project. The brick wall on the left was actually sitting right on top of the wall and crushed the side wall in 6 inches due to too much ground pressure. The wall was removed, straightened, broken pipes repaired and pressure tested, and then moved back 4 feet and a new concrete deck poured. They also installed a ground water sump pump about 15 feet down to pump out when ground water gets to high.