I think it's time for a new look.
Liner installed, air evacuated and filling with water.
Wow!! Refreshing. Enjoy.
I think it's time for a new look.
Liner installed, air evacuated and filling with water.
Wow!! Refreshing. Enjoy.
What a mess. Track is old and pulling out so we need to replace it.
New aluminum track with snap-loc installed around entire pool.
New liner installed, air evacuated and now ready for water.
Beautiful!! Enjoy.
Hole dug ready for pool.
Buttress supports installed and radius leveled and ready for wall.
Floor prepped and ready for liner installation.
Liner installed and ready for water.
Pool finished and ready for fun.
Equipment hard plumbed away from pool.
Pool was installed in the ground and back filled with dirt instead of slurry.
Dirt has collapsed the pool wall. Without water in the pool this is what can and will happen.
Pool wall has been pulled back and dirt will need to be removed and all pool rails cleaned. The wall will then be reinstalled and floor retuned.
Back to new thanks to Above The Rest Pools. Enjoy!!
Ready for summer fun.
Doughboy In-Step Installed.
Equipment hard plumbed.
First pool of the season. Here we go!
First customer ready for summer.
First pool job of 2017.....Here we go!
Off to the new owner.
Luckily the sun came out allowing us to get this last liner of the year installed.
There it is.....TADA! Last liner of the season is in and done. It's been a great year and we will see you all next year in 2017. Call now to reserve your spot for the spring.