Yuck!!
New rice hull floor installed.
Back to new!!
Yuck!!
New rice hull floor installed.
Back to new!!
I think it's time for a new look.
Liner installed, air evacuated and filling with water.
Wow!! Refreshing. Enjoy.
What a mess. Track is old and pulling out so we need to replace it.
New aluminum track with snap-loc installed around entire pool.
New liner installed, air evacuated and now ready for water.
Beautiful!! Enjoy.
Hole dug ready for pool.
Buttress supports installed and radius leveled and ready for wall.
Floor prepped and ready for liner installation.
Liner installed and ready for water.
Pool finished and ready for fun.
Equipment hard plumbed away from pool.
Pool was installed in the ground and back filled with dirt instead of slurry.
Dirt has collapsed the pool wall. Without water in the pool this is what can and will happen.
Pool wall has been pulled back and dirt will need to be removed and all pool rails cleaned. The wall will then be reinstalled and floor retuned.
Back to new thanks to Above The Rest Pools. Enjoy!!
Ready for summer fun.
Doughboy In-Step Installed.
Equipment hard plumbed.