18x33 Above Ground Pool Installation in Lincoln, CA

IMG_0461.JPG

Hole dug ready for pool.  

IMG_0463.JPG

Buttress supports installed and radius leveled and ready for wall.  

IMG_0464.JPG

Floor prepped and ready for liner installation.  

IMG_0465.JPG

Liner installed and ready for water. 

IMG_0466.JPG

Pool finished and ready for fun.  

IMG_0467.JPG

Equipment hard plumbed away from pool.  

Posted on March 18, 2017 .

16x32 Above Ground Pool Liner Installation in Davis, CA

3341B66C-BC4C-417E-9E08-4FC41E837C3C.JPG

Pool was installed in the ground and back filled with dirt instead of slurry.  

F2AB717C-1954-446E-A74F-02C5F40496C4.JPG

Dirt has collapsed the pool wall. Without water in the pool this is what can and will happen.  

3CCEF935-EEDD-4F62-9748-9DC4DADFC3D2.JPG

Pool wall has been pulled back and dirt will need to be removed and all pool rails cleaned. The wall will then be reinstalled and floor retuned.  

9AD12867-9C81-4ECD-8264-53F212109812.JPG

Back to new thanks to Above The Rest Pools. Enjoy!! 

Posted on March 15, 2017 .